Before you start
- Every required action on the work order done: checklists answered, and a serial and a photo for each piece of equipment on the job. Until they are, Complete stays greyed out.
- The completion note written. The box starts filled in; see below.
Steps
1
Check the note
Read the completion note and the recommendations, and change what does not fit the visit.
2
Tap Complete
Tap Complete. The app asks Complete this work order?
3
Confirm
Tap Complete again. The appointment and the work order are marked complete with the time, and the work order with your name and your note.
The completion note starts from a template
Opening the note fills the box for you. For a service, maintenance or installation job the app writes in the template for that type of job, and the recommendations box from a second template; you then change what does not fit. Every other type of job opens with an empty box on purpose. A note holding a blocked word cannot be saved. The templates and the blocked words are rows in the engine, not in the app: a developer changes a template row, and the next note started in the app uses the new wording. No app release is needed.Tapping Complete makes the job’s equipment
Each line whose product converts to an asset becomes a piece of equipment on the customer, at their service address, whether the job was booked from the Service calendar widget in Zoho or typed straight into Zoho. The piece is added to the work order’s equipment list in Zoho too. A job that already has equipment gets none added, so a widget-booked installation, which made its equipment at booking time, is left alone. The model, brand and type come from the product; the serial and the photos are what you record on site.How you know it worked
- In Zoho, the appointment and the work order show Completed, with Completed By and Completed At. Completed At is the moment of the tap.
- Once billing has run, the work order’s Billing Status reads Invoiced, unless the job has nothing billed to the customer.